PENERAPAN METODA LINTASAN KRITIS (CRITICAL PATH METHOD) UNTUK MEMPERCEPAT WAKTU PENYELESAIAN PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT INDUSTRI GARAM DI PT."X" | Perpustakaan

Record Detail

No image available for this title

Tugas Akhir Sarjana

PENERAPAN METODA LINTASAN KRITIS (CRITICAL PATH METHOD) UNTUK MEMPERCEPAT WAKTU PENYELESAIAN PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT INDUSTRI GARAM DI PT."X"



Description Not Available


Availability
TI1995048TI 1995 48Perpustakaan ITIAvailable but not for loan - Stock Relegation

Detail Information

Series Title
-
Call Number
TI 1995 48
Publisher TEKNIK INDUSTRI : Serpong.,
Collation
-
Language
Indonesia
ISBN/ISSN
-
Classification
NONE
Content Type
-
Media Type
-
Carrier Type
-
Edition
-
Subject(s)
Specific Detail Info
-
Statement of Responsibility

Other version/related

No other version available




Information


RECORD DETAIL


Back To PreviousXML DetailCite this



Perpustakaan

Institut Teknologi Indonesia

   Jl. Raya Puspiptek Serpong, Kota Tangerang Selatan 15320



V I S I

Menjadi Pusat Informasi Terdepan


M I S I

1.) Menyediakan Layanan Prima Yang Berorientasi Kepada Pemustaka;

2.) Menjadi Pusat Akses Informasi Seluruh Civitas Akademika Institut Teknologi Indonesia;

3.) Menjadi Unit Yang Profesional Dalam Penyedia Informasi Di Lingkungan Akademis.